Using Gantt Chart

Gantt Chart Structure – Panels:

The Pulse Gantt Chart is dived into two separate Panels:

  • The Task Table Panel on the left-hand side
  • The Schedule Panel on the right-hand side

Change Size of ‘Panels’

If you want to see more of your Schedule Panel and less of your Task Table Panel, you can adjust the sizes of the different areas.

To adjust the size of the different Panels, simply hover over the thick dividing line between the two panels – the line should become wider and left and right arrows will appear in the centre of the line.

Scheduler Panel Short-Cuts

  1. You can Click and Drag the screen divider to expose more or less of the tabular data of the Tasks.
  2. You can Click the Arrows to show only one side of the panel or return to previous state.
  3. You can Choose ‘Hide Schedule’ from the Gantt > Actions button in the header to completely Hide/Show the display of the Schedule.